1 Result Found

Provencher Bridge Project Archaeological Impact Assessment

Assessment of the impact of bridge construction reports on recoveries from a total of 26 test holes excavated by backhoe and Geo-Technical drilling. 1387 artifacts were recovered from at least seven discrete occupations representing the following periods: Railroad (1885-1988); Historic Flood (between 1826 and 1881); and Late Woodland (AD 1000-1750) including evidence of at least five occupations, Blackduck ceramics (AD 500 to 1750), and indications of extensive trade and seasonal visitation to The Forks. Appendices include Geo-Technical data and artifact catalogue.
Quaternary Consultants Ltd.. 1989. Provencher Bridge Project Archaeological Impact Assessment. Winnipeg:Quaternary Consultants Ltd.. Prepared for Prepared for Wardrop Engineering Inc.. [ CRM report (58pp)(HRB, MM) ]
View Source (new window)